‘Short walk’: Council’s Story Bridge message to commuters

Brisbane City Council has revealed plans for those using public transport during the Story Bridge closure, revealing some will have their daily trips shaken up.

Nov 18, 2026, updated Nov 18, 2026
Major bus lines will be affected by the three-week closure of Story Bridge.
Major bus lines will be affected by the three-week closure of Story Bridge.

Passengers who use public transport to commute across Story Bridge may have to change buses or travel to new stops “just a short walk” away to complete their journey, Brisbane City Council has revealed.

The city’s iconic bridge is set to close for three weeks over the Christmas holidays for maintenance, throwing the travel plans of about 100,000 daily vehicles into chaos.

Major bus lines would also be affected, with the council confirming diversions would be put in place for the duration of the works.

Five bus stops would also close for the duration of the resurfacing with alternate stops “available nearby”, the council said in a statement.

Brisbane City Council Transport Chair Andrew Wines said the council had chosen the Christmas holiday period to close the bridge to “reduce disruption” particularly to school drop off traffic.

He said passengers would still be able to reach their destinations, with council providing plenty of time to plan ahead.

“Thousands of people rely on our buses every day and we’ve made sure they can still get where they need to go, with alternative stops just a short walk from the ones that are temporarily closed.

“We’ll have alternative public transport options in place to keep passengers moving while the Story Bridge gets the sequel it deserves.”

The 86-year-old bridge is set to close from Sunday, December 27, 2026, to Monday, January 18, 2027.

Stay informed, daily

As part of the council’s $110 million Operation Smooth, the southern approach and parts of the northern approach of the bridge will be resurfaced.

Structural maintenance will also be carried out and waterproofing of the road deck to help extend its lifespan.

Opened in July, 1940, the steel bridge is deteriorating as it bears the weight of an unprecedented volume of traffic and may close within 20 years if action isn’t taken, a previous council report revealed.

Temporary bus route changes include:
Routes 227, 228, 231, 232 and 236: Services will divert via Wellington Road and Latrobe Street, with temporary stops 350 to 400 metres from affected Shafston Avenue stops.
Routes 227, 232 and 234: The Main Street stop at Story Bridge East will close, with an alternative stop at Thornton Street, approximately 200 metres away.
Routes 216, 221, 227, 228, 231, 232 and 236: Services will divert around Shafston Avenue at Connor Street, with alternative stops 250 to 500 metres away.
Route N154: Five Main Street stops will no longer be serviced by this route. Passengers can use Route N226 to Wellington Street, with safe drop-offs available along the route.

Temporary bus stop closures include:
Shafston Avenue at Salstone Street, stop 11. Residents can use the nearby stops on Latrobe Street and Wellington Road.
Shafston Avenue at Connor Street, stop 10/6. Residents can use the nearby stops Main Street at St Vincents Hospital, Pearson Street, or River Terrace.
Shafston Avenue at Connor Street, stop 7/10. Residents can use the nearby stops Main Street at St Vincents Hospital, Pearson Street, or River Terrace.
Main Street at Story Bridge East, stop 6. Residents can use the nearby stop, Main Street at Thornton Street.

Want to see more stories from InDaily Qld in your Google search results?

  1. Click here to set InDaily Qld as a preferred source.
  2. Tick the box next to "InDaily Qld". That's it.
News